
Air handling units (AHU)
AHU replacement, EC fan upgrades, controls and planned servicing.
Maintenance and repairs
Planned visits for AHUs, heat recovery and extract fans, with records you can show.

A ventilation maintenance contract is a schedule of planned visits to keep fans, filters, belts, controls and heat exchangers working at their design airflows. We set the frequency to your equipment and use, keep records of every visit, and price repairs before carrying them out.
Ventilation that is not maintained slowly loses airflow, costs more to run and fails at the worst time. SFG20 schedules are widely used to set maintenance tasks and frequencies, and many insurers and landlords expect evidence that plant is serviced.
Contracts range from two visits a year for a single unit to full multi-site schedules. Kitchen extract cleaning and LEV testing can be added to the same contract.
Small offices, shops and clinics with one or two units.
Portfolios and estates on one schedule and price list.
TR19 cleaning and LEV testing on the same contract.
Repair visits at the rates set out in your contract.
| Work | Guide price |
|---|---|
| Planned maintenance contract, small site (up to 2 units, 2 visits a year) (per year) | £495–£1,195 + VAT |
| Air handling unit service: filters, belts or EC fan check, coils, controls (per unit per visit) | £195–£395 + VAT |
Guide prices using West Midlands (our baseline) rates. Home prices include VAT at 20%; business prices exclude VAT. A guide price is not a quote: we confirm a fixed price in writing first. London is about 20% higher and the North East about 8% lower.
List of units, fans and systems with condition notes.
Visit frequency and tasks agreed.
Planned maintenance carried out and recorded.
Visit reports and recommended works.
Annual review of costs and condition.
In England, ventilation is covered by Part F of the Building Regulations and its guidance, Approved Document F (2021 edition). Workplaces must also be ventilated with a sufficient quantity of fresh or purified air under the Workplace (Health, Safety and Welfare) Regulations 1992.
Wales has its own Part F ventilation guidance, published by the Welsh Government, and work is checked by building control. The Workplace (Health, Safety and Welfare) Regulations 1992 also apply, requiring sufficient fresh or purified air.
In Scotland, ventilation is covered by the Building (Scotland) Regulations and section 3 of the Technical Handbooks, and most building work needs a building warrant first. The Workplace (Health, Safety and Welfare) Regulations 1992 apply in Scotland too, requiring sufficient fresh or purified air.
In Northern Ireland, ventilation is covered by the Building Regulations (Northern Ireland) and Technical Booklet K. Northern Ireland has its own Workplace (Health, Safety and Welfare) Regulations (Northern Ireland) 1993 with the same duty to ventilate.
A small site with up to two units and two visits a year typically costs £495 to £1,195 a year excluding VAT. Larger sites are priced from an asset survey.
Most commercial ventilation units need servicing at least twice a year, with filters checked more often in dirty environments.
Filters, fans, belts or EC fan checks, heat exchanger and drain checks, controls and a measured airflow spot-check, with a written record.
Yes. We start with an asset survey so we know what is on site and its condition.
Yes. TR19 cleaning and LEV testing can be scheduled on the same contract.
Yes. Any work outside the contract is priced and agreed before it starts.

AHU replacement, EC fan upgrades, controls and planned servicing.

Noisy, failed or leaking fans, PIV, MVHR and commercial extract put right.

Kitchen extract and ventilation duct cleaning with photo reports for insurers.

Fume, dust and mist extraction for workshops, with COSHH thorough examination and testing.
Choose your area for local guide prices and the towns we cover.
Answer a few questions for a price range, or send photos and we will come back to you with a written quote.