Condensation, mould and landlords, Bristol
Social housing ventilation programmes in Bristol
Survey-led ventilation upgrades across stock, with per-home records and tenant liaison, across Bristol.
- From £675 + VAT per home
- Free survey

Social landlords need to find and fix damp and mould hazards quickly, and ventilation is usually the core of the fix. We survey homes, install continuous extract, PIV or heat recovery as needed, measure the airflow, and report per address so your asset and compliance teams have evidence of what was done.
If you are anywhere in Bristol, send the postcode and a few photos and we will tell you what we would recommend. Towns we cover include Bristol.
Social housing in Bristol at a glance
- Area
- Bristol
- Towns listed
- 1, largest Bristol
- Postcode districts
- BS10 and BS1
- Price region
- South West
- Survey
- Free survey (UK mainland)
What social housing ventilation programmes involves
It sets timescales for investigating hazards, making homes safe from significant damp and mould, and dealing with emergencies, with more hazard types added from 30 November 2026. Ventilation contractors are a common part of meeting those timescales. We can take reactive jobs, planned programmes and voids.
Reactive damp and mould jobs
Surveys and fixes raised from tenant reports, prioritised to your timescales.
Planned programmes
Block or estate-wide upgrades to a standard specification.
Void works
Ventilation upgraded and tested before re-letting.
Guide prices in Bristol
| Work | Guide price |
|---|---|
| Social housing ventilation upgrade, per home (survey-led PIV or dMEV programme) (per home) | £675–£1,500 + VAT |
| Condensation and mould ventilation survey with written findings (per home) | £130–£235 inc VAT |
Guide prices using South West rates. Home prices include VAT at 20%; business prices exclude VAT. A guide price is not a quote: we confirm a fixed price in writing first.
Signs it is time to call us
- A rise in damp and mould reports from tenants
- Stock with fans that have failed or been switched off
- Retrofit insulation programmes that need ventilation alongside them
Rules in England
English building work follows Approved Document F (2021 edition) for ventilation rates, installation and commissioning. Damp and mould is assessed as a hazard under the Housing Health and Safety Rating System in England. Awaab's Law has applied to social landlords in England since 27 October 2025, with timescales for investigating and fixing significant damp and mould.
How the job runs
- Scope
- Survey
- Install
- Test
- Report
Towns we cover in Bristol
Questions about social housing ventilation programmes in Bristol
Which towns in Bristol do you cover?
All of Bristol, including Bristol. If your town is not listed, send the postcode and we will confirm.
What does Awaab's Law require social landlords to do?
Awaab's Law requires social landlords in England to investigate potential hazards within set timescales, make homes safe from significant damp and mould within 5 working days of the investigation, and deal with emergency hazards within 24 hours, with more hazards added from 30 November 2026.
Can you work to our specification and frameworks?
Yes. We can work to your specification, product lists and reporting format, and discuss framework or call-off arrangements.
Are prices different in Bristol?
Our guide prices are adjusted by region. In Bristol we use South West rates, so social housing ventilation upgrade, per home (survey-led PIV or dMEV programme) is typically £675 to £1,500 + VAT per home.
Is the survey free in Bristol?
For new installations on the UK mainland, yes. The survey is free and the quote that follows is fixed and in writing. Servicing, testing and repair visits are charged, and we confirm the cost before booking.
Other services in Bristol
Get a guide price in two minutes
Answer a few questions for a price range, or send photos and we will come back to you with a written quote.